| Brand Name: | DLX |
| Model Number: | K438 (738LC) |
| MOQ: | 5kg |
| Price: | 121/KG |
| Supply Ability: | 20,000 tons per year |
K438 (738LC) master alloy bar is cast and certified in Changzhou in round sections from 8.0 mm to 200 mm, with the grade fixed on the order and the lot documents issued with the material.
![]()
A foundry that adds a new material to its melt does not buy it the way it buys consumables. It qualifies the source first, because a grade addition that behaves unexpectedly shows up later as a casting that fails inspection. Vendor approval therefore runs on documents before it runs on price.
The material behind that approval is cast at a plant that has melted alloys since 2002 and holds ISO 9001 and SGS certification, so the qualification pack is assembled from a working quality system rather than written for the occasion.
![]()
![]()
| Grade | K438 (738LC) |
| Product Form | Cast master alloy bar, round section |
| Diameter Range | 8.0 mm to 200 mm |
| Melting Route | Vacuum melting |
| Casting Route | Bar casting |
| Grade Agreement | Composition and impurity limits fixed on the order |
| Lot Documentation | Mill test certificate, packing list, invoice, bill of lading |
| Cut Length | Made to the charging length used at the foundry |
| Internal Quality | Uniform structure assessed where the order requires it |
| Surface | Clean, consistent finish |
| Certification | ISO 9001, SGS |
| Packing | Rod bundles with protective wrapping, export wooden cases |
Approval usually starts with a short list of documents rather than a physical sample. A certifying body wants to see the quality system in place, so the certificates held by the plant are the first item. The second is the grade agreement, since it shows how a composition is fixed with a customer. The third is a specimen lot certificate, which shows what a buyer receives alongside the material. Where the foundry is itself audited by its own customer, these documents travel down the chain unchanged.
Both the grade and its companion designation appear on the material, and the certificate issued with a lot is keyed to that identity. The certificate states the composition of the cast that was released, so the foundry compares the incoming material against the document it was approved on. Nothing in the paperwork describes a different grade from the one on the case.
After approval, a first lot is ordered and put through the foundry's own incoming inspection. Once that lot has passed, the same grade and the same document format are repeated on later orders, which keeps the inspection routine steady and any variation easy to see. The first order therefore carries more weight than its size suggests, and a trial quantity is normally used for it.
Supplier approval is only useful if the grade can be delivered again. Melting and bar casting sit at the same site, and the plant runs an annual capacity of 10,000 tons across a 12,000 m² operation, so an approved grade can be scheduled as a repeat cast rather than quoted case by case. Diameter and cut length are confirmed on the order as they are for any lot.
Master alloy bar in K438 (738LC) is charged in investment casting operations for cast parts that run at high temperature, including aero engine castings, automotive turbocharger wheels, chemical pumps and valves, and glass manufacturing hardware.
![]()
![]()
Each lot is checked against the grade agreed on the order before it is released, and the surface is inspected before packing. The certificate issued with the lot describes the material as packed, so a consignee can set the document against the cases on arrival and against earlier lots on a repeat order.
![]()
![]()
The grade designations carried on this page belong to the cast grade series applied to high-temperature alloys in the Chinese standard system. Composition and impurity limits are verified against the grade agreed on the order, and lot-level chemistry and structure are checked against in-house inspection records and the mill test certificate issued with the consignment. Plant certification is held as ISO 9001 with SGS auditing.
Bar is supplied in rod bundles with protective wrapping, packed in export wooden cases labelled with the grade, the diameter and the lot number. A production lot is scheduled 15-30 days from order confirmation, and freight is quoted to the destination port named on the enquiry.
![]()
Certification at Changzhou DLX Alloy Co., Ltd. rests on two documents an auditor can ask for: ISO 9001 and SGS. Behind them sits a plant founded in 2002, covering 12,000 m² with an annual capacity of 10,000 tons, where alloys are melted and processed for customers in more than 60 export countries. A master alloy grade is handled the same way across that range, with the composition agreed on the order and the lot documents issued with the material.
Name the grade, the diameter and the quantity required, and a quotation for the lot is prepared from that.
![]()
Q: Which documents are issued with a K438 (738LC) lot?A: A mill test certificate stating the composition of the lot, together with the packing list, the commercial invoice and the bill of lading, and a certificate of origin where the importer needs one.
Q: What is needed to qualify DLX as a master alloy supplier?A: The certification held by the plant, the grade agreement format, and a specimen lot certificate. Say what your approval process requires and the pack is prepared from that.
Q: Is the grade stated on the material and on the certificate?A: Both designations appear on the cases, and the certificate issued with the lot is keyed to the same grade and lot number.
Q: Can a first lot be ordered before committing to repeat supply?A: Yes. A trial quantity is normally used for a first lot, and the result of the foundry's incoming inspection decides whether repeat orders follow.
Q: Will a repeat order match the approved lot?A: The grade and the document format are repeated, and the lot record is retained so a later consignment can be compared with the approved one.
Q: What is the minimum order quantity?A: The minimum is confirmed along with the grade and the diameter, because those two decide the size of the cast.
Q: What is the delivery time?A: A production lot is scheduled 15-30 days from order confirmation.
Q: Which shipping terms are quoted?A: Freight is quoted to the destination port on FOB, CFR or CIF terms against the port named on the enquiry.